DORA Articles 11 and 12 require ICT business continuity management and disaster recovery with specific technical requirements. For financial infrastructure, "best effort" recovery isn't acceptable — you need defined RTOs, RPOs, and tested recovery procedures.
DORA-Specific DR Requirements
- Dedicated ICT business continuity policy — Separate from general business continuity, focused on technology infrastructure
- Impact analysis — Quantified impact of severe disruptions to ICT systems on business functions
- Recovery objectives — Defined RTO and RPO for every critical ICT system, with justification
- Secondary processing site — Geographically separated, capable of ensuring continuity of critical functions
- Annual testing — DR plans tested at least annually with documented results and remediation of gaps
Infrastructure Architecture
Multi-Region Active-Active
For critical systems (payments, trading, core banking), active-active deployment across regions. Both sites serve traffic. Failover is automatic and seamless. No RTO — the system never goes down, it just shifts load.
Active-Passive with Automated Failover
For important but not critical systems: warm standby in a secondary region. Automated failover with DNS-based or load-balancer-based switching. Target RTO: 15-30 minutes. Regular failover drills to validate.
Immutable Backup Infrastructure
Ransomware-resilient backups: air-gapped or immutable storage, encryption with separate key management, automated restoration testing (not just backup verification), cross-region replication with independent access controls.
Kubernetes Recipes
A practical guide for container orchestration and deployment by Grzegorz Stencel & Luca Berton (Apress).
Watch on Skillshare →Testing Infrastructure
DORA requires annual DR testing. Build infrastructure that makes testing routine:
- Automated failover testing — scheduled, monitored, with automatic pass/fail assessment
- Backup restoration testing — monthly automated restores to validate backup integrity
- Communication testing — automated notification chains for crisis communication
- Full-scale simulation — annual exercise simulating complete primary site loss
Luca Berton